With the continuous improvement of people's living and cultural level, the consumption concept, recreation and leisure constantly updated, water amusement - as a kind of recreation facilities more and more popular with the majority of tourists, gradually become a popular fashion trend. Water park is the main body of water, set leisure, entertainment, sports as one of the large comprehensive amusement places. And the water slide, the pool is one of the main components, especially the water slide stand out, especially by people's favor.
Description
How to install family pool slides?
With the continuous improvement of people's living and cultural level, the consumption concept, recreation and leisure constantly updated, water amusement - as a kind of recreation facilities more and more popular with the majority of tourists, gradually become a popular fashion trend. Water park is the main body of water, set leisure, entertainment, sports as one of the large comprehensive amusement places. And the water slide, the pool is one of the main components, especially the water slide stand out, especially by people's favor.
The family pool slide consists of a sliding platform(some times no need platform), fiberglass slide way, steel structure supporting the slide, departure platform, buffer section of the slide, water supply and drainage piping system, water pump, electrical control cabinet and other parts. Visitors start from the entrance of the slide on the sliding platform, and slide into the pool after obtaining a certain initial speed through the initial acceleration section under the action of water buoyancy, thrust and lubrication.
Environmental condition requirements for family slides:
1. Use temperature 18 ~ 46℃.
2. The ambient relative humidity ranges from 28% to 99%.
3. In case of lightning, heavy rain, fog, strong wind (wind speed > 15m/s) and other bad weather, the slide should be stopped.
4. When artificial lighting is used at night, the illumination of water surface shall not be less than 75LX.
5. The equipment must stop running in snowy days.
The requirements for the equipment base of the home slide:
1. Slide foundation construction shall be designed and constructed in strict accordance with the requirements of civil engineering drawings provided by the company.
2. When locating the foundation, the selected datum shall be consistent with the requirements of the drawing, and the deviation of the coordinate position (longitudinal and horizontal axis) of the foundation (including the anchor bolts of embedded parts) shall not exceed ±15mm, and the deviation of elevation value shall not exceed -15mm.
3. The foundation shall not have abnormal phenomena such as uneven settlement, cracking and loosening that affect the normal operation of the slide.
4. The oil, gravel, soil, and water on the foundation surface shall be cleared, and the threads and nuts of anchor bolts shall be well protected.
5. When installing the foundation, the anchor bolts should be connected with anti-loosening measures (double nuts).
Attention should be paid to quality problems:
1. Slides and slide rails
2. Slide size shall comply with design requirements and relevant standards and specifications.
3. Fastening bolts for connection and installation, slide interfaces should be smooth.
4. The height of the slide platform railing shall not be less than 1.2 meters, the distance between the vertical railing and the distance between the horizontal railing and the ground shall not be greater than 120㎜, and the installation shall be firm and reliable and meet the safety requirements.
Early embedding work:
1. According to the requirements of the final assembly drawings, the following parts shall be pre-embedded:
2. Pre-embedded parts of the water supply pipe sleeve and its connecting bracket of the sliding platform;
3. Embedment of slide supporting foundation pieces such as columns;
4. Embedment of pipe sleeves of water supply and drainage system;
5. Embedment of lightning arrester, grounding device and equipotential system of slide.
Water slide installation:
The main process of slide installation is as follows:
Foundation cable payout, wire inspection → slide steel structure installation → slide installation → electrical equipment installation → slide acceptance
Safety precautions during installation:
5.3. When the meteorological conditions do not meet the requirements of equipment installation, measures shall be taken. No construction shall be carried out until measures have been taken.
5.4. When using the building structure as the load point of lifting and handling equipment, the bearing capacity of the structure should be calculated. If necessary, it can be used with the consent of the design unit.
5.5. Safety shall be paid attention to in the transportation and hoisting of slide columns. Each column must be perpendicular to the horizontal plane.
5.6 Scaffold lapping shall comply with safety regulations.
5.7 The lifting operation of the arm shall comply with the requirements of site construction safety and technical procedures.
5.8. The personnel entering the construction site must wear the qualified safety helmet correctly, fasten the jaw belt and lock the buckle.
5.9. During operation, personal protective equipment must be properly used according to regulations. Dress neatly, and it is strictly prohibited to enter the construction site barefoot, wearing slippers and high heels.
5.10. In the absence of reliable safety protection facilities in the height (more than 2 meters) and steep slope construction, must fasten qualified safety belt, safety belt to firmly, high hanging low use, at the same time height operation shall not wear hard sole and slippery shoes with nails, wear non-slip rubber shoes.
5.11. Personnel engaged in special operations must hold a certificate to work, and are strictly prohibited to operate without a license or mechanical equipment that has nothing to do with them.
5.12. When there is heavy fog, rain, snow and strong wind above force 6, the high work on the scaffold shall not be carried out. Safety and anti-skid measures must be taken when working after rain and snow.